| Project Description: |
BOSTON- ROADWAY RECONSTRUCTION, WASHINGTON STREET FROM EGLESTON SQUARE TO DUDLEY STREET (1.2 MILES) (PHASE IV)
This is a full depth roadway reconstruction project which includes the installation of curbing, sidewalks, traffic lines, tree plantings, signs and traffic signals.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Project Manager: | Albert Miller![]() |
| Estimated Total Federal Participating Construction Cost: | $4,000,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 09/30/2000 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||