Project Description: |
BOSTON- ROADWAY RECONSTRUCTION, WASHINGTON STREET FROM EGLESTON SQUARE TO DUDLEY STREET (1.2 MILES) (PHASE IV)
This is a full depth roadway reconstruction project which includes the installation of curbing, sidewalks, traffic lines, tree plantings, signs and traffic signals.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Other |
Project Manager: | Albert Miller |
Estimated Total Federal Participating Construction Cost: | $4,000,000.00 |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 09/30/2000 ) |
|
Bridges |
|
|
|