| Project Description: |
TAUNTON- WINDOW AND DOOR REPLACEMENT AT THE DISTRICT 5 ADMINISTRATION BUILDING
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Bassam Salfity![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project has been advertised for construction bids. (as of 10/12/2002 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||