| Project Description: |
TAUNTON- BRIDGE REPLACEMENT, BR# T-01-011 SPRING STREET OVER MILL RIVER
The project consists of the replacement of Spring Street bridge over the Mill River. The project length is approximately 400 feet. A sidewalk will be constructed on each side of the bridge.
|
| Location: |
|
| Resident Engineer: | Gary Dixon![]() |
| Construction Contract Value: | $1,197,939.00 |
| Construction Bid Price: | $1,062,490.00 |
| Initial Construction Estimate: | $937,015.00 |
| District: | District 5 |
|