| Project Description: |
BRIMFIELD- BRIDGE REHABILITATION, BR# B-24-018 WASHINGTON STREET OVER CONRAIL
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Martin Leelman![]() |
| Estimated Total Contract Cost: | $977,976.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||