WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA)
The proposed project consists of reconstructing and widening Route 18 from Highland Place in Weymouth to Route 139 in Abington including the replacement of Bridge W-32-13 over the MBTA. The roadway widening will provide an additional travel lane in each direction. A temporary alignment will be constructed adjacent to the bridge to the east to carry Route 18 traffic while the existing bridge is being replaced. A long three day weekend shutdown of MBTA service and detour of Route 18 traffic will be required to slide the new bridge superstructure onto the final bridge supports. The proposed roadway cross section consists of four 11.5’ travel lanes, two 5’ shoulders and two 5.5’ sidewalks. Shared accommodations for all users have been provided in accordance with applicable guidelines.
Location:
  • Town of Abington
  • Town of Weymouth
  • Construction Begins: Summer 2017
    Resident Engineer: Simao Monteiro
    Construction Bid Price: $56,746,003.00
    District: District 6

    Contracts (15) Progress
    # 115769 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 115791 -- Design -- Services
    Statewide - Master Service Agreement for design and review services. Final
    # 43147 -- Design -- Services
    Weymouth to Abington - Widening Route 18 from two to four lanes; environmental documentation and 25% design Final
    # 51301 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 57598 -- Design -- Hwy Eng Open End
    Work will consist of providing design and engineering services to MassHighway on a task order basis for various statewide Value Engineering Studies. Final
    # 64304 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64321 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 68386 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 68753 -- Design -- Services
    Weymouth-Rte 18 widening (FINAL DESIGN) -- Final
    # 69755 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various highway and bridge projects. Final
    # 77863 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77867 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77884 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 80656 -- Non-system contract type
    Statewide - Owner's Representative will perform peer reviews and manage cost recovery and value engineering
    # 97936 -- Construction Contract
    Roadway Reconstruction, Widening and Bridge Replacement Br. No. W-32-013 (Including Signals) along a Section of Route 18 (Main and Bedford Streets). Completed

    Bridges

    Contract Dates
    Notice to Proceed: 09/11/2017
    Contract Information
    Project Designer: Consultant
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Review Committee PRC Approved 12/11/1995
    Project Status Advertised 09/24/2016
    Project Management
    100% Design 100% Package Received 04/08/2016
    100% Design 100% Package Comments to DE 06/13/2016
    25% Design 25% Package Received 02/27/2012
    25% Design 25% Package Comments to DE 08/13/2012
    25% Design 25% Package Comments to DE 06/12/2015
    25% Design Design Public Hearing 04/24/2013
    75% Design 75% Package Received 10/15/2013
    75% Design 75% Package Comments to DE 10/17/2014
    75% Design 75% Plans Approved 02/13/2015
    Final Design PS&E Received 08/15/2016
    Final Design PS&E Received 09/12/2016
    Final Design PS&E to FAPRO 09/12/2016