Project Description: |
LOWELL- BRIDGE REHABILITATION, BR# L-15-019 BRIDGE STREET OVER MERRIMACK RIVER (JOHN C. COX MEMORIAL BRIDGE)
The work consists of removing and replacing the existing concrete sidewalks. The original railing will be reinstalled in the new sidewalks.
|
Location: |
|
Resident Engineer: | Mark Fedele |
Construction Contract Value: | $4,668,051.75 |
Construction Bid Price: | $2,720,266.75 |
Initial Construction Estimate: | $3,516,152.00 |
District: | District 4 |
Current Status: | Final inspection was held 5/23/2006 this job is complete. No further reports forthcoming. (as of 05/25/2006) |
|