Project Description: |
HOLDEN- BRIDGE REPLACEMENT, BR# H-18-016 RIVER STREET OVER QUINAPOXET RIVER
The proposed project includes total bridge replacement with minor incidental roadway work. The proposed bridge reconstruction will require closing the bridge to traffic with a signed detour in place. Included in this project are guardrail, curbing and sediment controls for the Quinapoxet River.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Albert Miller |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 09/29/2001 ) |
|
Bridges
|
|
|
|