| Project Description: |
HOLDEN- BRIDGE REPLACEMENT, BR# H-18-016 RIVER STREET OVER QUINAPOXET RIVER
The proposed project includes total bridge replacement with minor incidental roadway work. The proposed bridge reconstruction will require closing the bridge to traffic with a signed detour in place. Included in this project are guardrail, curbing and sediment controls for the Quinapoxet River.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Albert Miller![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 09/29/2001 ) |
|