CHICOPEE- HOLYOKE- RESURFACING & RELATED WORK, ROUTE I-391 FROM MAIN STREET (HOLYOKE) TO ROUTE I-91 (4.1 MILES)
The project begins at the I-391 on-ramp from I-91 in Chicopee and extends northerly to High Street in Holyoke. This project consists of the following: resurfacing I-391 in Chicopee and Holyoke, resurfacing portions of Center Street (Rte. 116), Chicopee Street (Rte. 116), Grattan Street (Rte. 141) in Chicopee and resurfacing the I-391 ramps. The work also includes: highway guard, pavement markings, rumble strips, snowplowable raised pavement markers, resetting curb, replacement of sidewalks.
Location:
  • City of Chicopee
  • City of Holyoke
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: Other
    Project Manager: Albert Li
    Estimated Total Contract Cost: $5,022,715.84
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project