PEABODY- BRIDGE REPLACEMENT (PEDESTRIAN STRUCTURE), BR# P-03-011, NORTH CENTRAL STREET OVER MBTA AND B&M RAILROAD
This project is a complete demolition and removal of the existing pedestrian bridge. The new bridge superstructure will consist of Brimfield Historic trusses and a concrete deck slab. The bridge shall be closed to pedestrians during construction. Work also includes reconstruction of both pedestrian approaches, minor roadway reconstruction, installation of various types of highway pedestrian rail, and necessary incidental work.
Location:
  • City of Peabody
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: Other
    Project Manager: Manhar Patel
    Estimated Total Contract Cost: $759,068.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • P03011 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project