SHREWSBURY- SIGNAL UPDATE, ROUTE 9 AT QUINSIGAMOND AVENUE
The proposed improvements at the subject intersection are designed to increase capacity and improve safety. The roadway work consists of the partial reconstruction and widening of a portion of Route 9 on the south side, widening both sides of North Quinsigamond Avenue, widening west side of South Quinsigamond Avenue, construction of traffic signal system, including a new box span wire assembly and loop detectors, and the installation of signs, pavement markings and incidental work including the installation of guardrail and drainage.
Location:
  • Town of Shrewsbury
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Tri-jay Q Nguy
    Estimated Total Contract Cost: $1,954,447.01
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project