| Project Description: |
BUCKLAND- SHELBURNE- CLEANING AND PAINTING STEEL BRIDGE, BR# B-28-022=S-11-001 ROUTE 2A (BRIDGE STREET) OVER THE DEERFIELD RIVER
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $975,000.00 |
| District: | District 1 |
| Current Status: | This project has been advertised for construction bids. (as of 08/17/1996 ) |
|
Bridges
|
||||||
|
|
|
||||||||||||||