| Project Description: |
WORCESTER- RECONSTRUCTION OF BLACKSTONE RIVER ROAD (FORMERLY MILLBURY STREET) FROM MCKEON ROAD TO LENORA STREET
The project includes full depth reconstruction, milling and resufacing with new sidewalks for a distance of 0.6 miles. Also included is a new signal at the Millbury Street/Greenwood Street intersection.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Municipality |
| Project Manager: | Luciano Rabito![]() |
| Estimated Total Contract Cost: | $2,247,319.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|