Project Description: |
HINGHAM- NORWELL- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 3A, ROUTE 228 AND DERBY STREET
The work to be done under this contract consists of resurfacing portions of the roadway for a total project length of 3.2 miles. Also included is the application of thermoplastic pavement markings and upgrades to the drainage system.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Brian Haggerty |
Estimated Total Federal Participating Construction Cost: | $3,000,000.00 |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 12/22/2001 ) |
|
Bridges |
|
|
|