Project Description: |
LENOX- RECONSTRUCTION OF ROUTE 7A (KEMBLE STREET) FROM ROUTE 7 TO ROUTE 183
Reconstruction of State Highway from the Route 7 intersection north for approximately 1.25 miles to the end of the State Highway just south of the intersection with Route 183. Included in the work is the excavation and removal of the existing roadway, replacement of the entire drainage system, replacement of asphalt curbing, signs, and reconstruction of the roadway.
|
Location: |
|
Resident Engineer: | Matthew Fillio |
Construction Contract Value: | $3,457,481.26 |
Construction Bid Price: | $2,997,312.00 |
Initial Construction Estimate: | $3,680,686.40 |
District: | District 1 |
|