Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
PEABODY- BRIDGE REPLACEMENTS, BR# P-03-007 JOHNSON ST. OVER B&M RR & MBTA & BR# P-03-008 JOHNSON STREET EXTENSION OVER MBTA
This project will result in the complete demolition and removal of the existing bridges. A temporary pedestrian bridge is provided for pedestrian movement during the construction of both bridges as they will both be closed during construction. Work also includes the reconstruction of the bridge approaches, cement concrete sidewalk, highway guardrail, pavement marking, loam borrow and seeding, and other incidental work.
Location:
  • City of Peabody
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: Other
    Project Manager: Manhar Patel
    Estimated Total Contract Cost: $1,759,394.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • P03007 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project