Project Description: |
HUDSON- BRIDGE REPLACEMENT, BR# H-25-005 BROAD STREET OVER ASSABET RIVER
This project consists of the demolition and removal of the existing bridge structure that carries Broad Street over the Assabet River and the construction of a new single span bridge in the same location. Work also includes stabilizing the slopes and paving a section of Wheeler Road.
|
Location: |
|
Resident Engineer: | George Berte |
Construction Contract Value: | $2,275,609.00 |
Construction Bid Price: | $2,047,645.00 |
Initial Construction Estimate: | $1,794,889.00 |
District: | District 3 |
Current Status: | Broad Street bridge is opened to traffic. Sidewalks, driveways, loam & seeding are completed. Punch list items are being worked upon. (as of 09/28/2005) |
|