| Project Description: | 
 DANVERS- BRIDGE REPLACEMENT, D-03-013, ROUTE 35 (WATER STREET) OVER WATERS RIVER 
A longer 2-span bridge totaling 138 feet will replace the existing Waters Street over Waters River culvert at its present location.  The new bridge opening will be 3 times larger than the existing opening to improve tidal flushing and prevent upstream tidal backups.  The width of roadway will be maintained and the sidewalk replaced. 
 | 
| Location: | 
 | 
| Resident Engineer: | Amanda Klemm![]()  | 
| Construction Contract Value: | $7,391,060.00 | 
| Construction Bid Price: | $6,393,400.00 | 
| Initial Construction Estimate: | $6,355,746.00 | 
| District: | District 4 | 
  | 