Project Description:
|
GRAFTON- ROADWAY RECONSTRUCTION INCL. SIGNALS @ 3 INTERSECTIONS, ROUTE 140 & 122; ROUTE 122 & BRIDGE ST.; ROUTE 140 & BRIDGE ST.
The work to be done under this contract involves the reconstruction of:
1. Route 140 and Route 122
2. Route 122 and Bridge Street
3. Route 140 and Bridge Street.
The work on this project includes cold planing and resurfacing of existing pavement, box widening, sidewalk reconstruction, placement of bituminous concrete pavement, installation of granite curbing and edging, storm drainage improvements, utility adjustments, pavement markings, warning and regulatory signs, installation of traffic signal controls.
|