| Project Description: |
MASHPEE- SIDEWALK AND SHOULDER CONSTRUCTION ALONG ROUTE 28 (FALMOUTH ROAD) FROM FALMOUTH T.L. TO SHELL BACK WAY (2,288')
|
| Location: |
|
| Resident Engineer: | -- not assigned --![]() |
| Construction Contract Value: | $1,257,113.92 |
| Construction Bid Price: | $959,370.40 |
| Initial Construction Estimate: | $745,000.00 |
| District: | District 5 |
|