| Project Description: |
LEXINGTON- MILTON- REVERE- INSTALLATION OF 8 - 10,000 GALLON ABOVE GROUND CaCl2 STORAGE TANKS AT 4 LOCATIONS
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Mark Cain![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 11/09/1996 ) |
|
Bridges |
||||||
|
|
|
|||||||||||