Project Description:
|
FALL RIVER- SOMERSET- BRIDGE REHABILITATION, BR# F-02-058=S-16-008 ROUTE I-195 OVER TAUNTON RIVER (BRAGA BRIDGE)
The work included under this contract is to remove the existing bridge deck pavement, repair any deteriorated concrete underneath the pavement, and resurface the bridge deck with Latex Modified Concrete (LMC). Additional work included in this project are minor structural repairs to bridge components at various locations, repair and or replacement of various inspection walkways, installation of temporary protective shielding and the application of temporary and permanent pavement markings. The total bridge length is 5,780 feet.
|