Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
BARRE- RESURFACING AND RELATED WORK, ROUTE 122 (WORCESTER ROAD)
The Route 122 resurfacing project begins at the Barre/Oakham Town Line and extends westerly to the end of State Highway at the Barre Town Common. The total length of the project is 4.8 miles. Also included is the realignment and full depth reconstruction of the intersection of Route 122, Route 32 and Valley Road. This roadway section will be resurfaced, with localized drainage and other minor repairs. The intersection realignment at Route 32 will improve safety by replacing the existing wide, skewed intersection with a right angle intersection.
Location:
  • Town of Barre
  • Resident Engineer: Jeffrey Hendricks
    Construction Contract Value: $1,973,969.00
    Construction Bid Price: $1,697,972.10
    Initial Construction Estimate: $1,624,739.00
    District: District 2
    Current Status: Physical work completed (as of 04/27/2006)
    Additional Info: None (as of 04/27/2006)

    Contracts (1) Progress
    # 37110 -- Construction Contract
    Cold planing and resurfacing on a section of Route 122, re-alignment and full depth reconstruction of the intersection of Route 122, Route 32 and Valley Road. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 03/07/2005
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Physical work completed
    Additional Info
    None
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 09/06/1996
    Project Review Committee PRC Approved 11/18/2003
    Project Status Advertised 08/28/2004
    Project Management
    100% Design 100% Plans Complete 04/13/2004
    Final Design PS&E Received 07/09/2004
    Final Design PS&E to FAPRO 08/02/2004