HUBBARDSTON- RECONSTRUCTION OF ROUTE 62 (OLD BOSTON TURNPIKE) FROM BARRE T.L. TO THE PRINCETON T.L.
This Town owned roadway project entails reclamation, resurfacing and areas of full depth construction on Route 62 (2-lanes). The work will begin at the Hubbardston/Barre Town Line and continue 4.1 miles easterly to the Hubbardston/Princeton Town Line. The project will realign the intersection of Route 62 with Twin Hill Road to improve sight distance. Drainage improvements will be made including replacing many culverts along the roadway.
|