| Project Description: |
BELLINGHAM- INSTALLATION OF TRAFFIC SIGNALS AT TWO LOCATIONS ON BLACKSTONE ST: RTE 126 (SOUTH MAIN ST) & RTE 140 (MECHANIC ST)
Work in this project includes roadway widening, cold planing, and resurfacing; installation of drainage pipes and structures, granite curbing and bituminous concrete sidewalks, traffic signals, signs and pavement markings.
|
| Location: |
|
| Project Manager: | Andreina Luckett![]() |
| Estimated Total Contract Cost: | $1,845,451.78 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|