Project Description:
BELLINGHAM- INSTALLATION OF TRAFFIC SIGNALS AT TWO LOCATIONS ON BLACKSTONE ST: RTE 126 (SOUTH MAIN ST) & RTE 140 (MECHANIC ST)
Work in this project includes roadway widening, cold planing, and resurfacing; installation of drainage pipes and structures, granite curbing and bituminous concrete sidewalks, traffic signals, signs and pavement markings.
Location:
  • Town of Bellingham
  • Project Manager: Andreina Luckett
    Estimated Total Contract Cost: $1,845,451.78
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project