Project Description:
|
AUBURN- RECONSTRUCTION OF ROUTE 12 (SOUTHBRIDGE STREET) FROM 200 FT. SOUTH OF CHURCH STREET TO ROUTE 20
The proposed work consists of the reconstruction of Southbridge Street (Route 12) from the junction with Route 20 to just south of Church Street, for a distance of 2.9 kilometers (1.8 miles). The work will include roadway widening and pavement reconstruction, sidewalk reconstruction, horizontal and vertical alignment, drainage system improvements, traffic signal installation, landscaping, and safety improvements such as signing and pavement markings.
|