Project Description: |
LYNN- SAUGUS- BRIDGE REPLACEMENT, BR# L-18-017=S-05-009, BOSTON STREET OVER THE SAUGUS RIVER
This project consists of the replacement of the Boston Street Bridge over the Saugus River. The project also includes some approach roadway reconstruction, widening of the bridge opening, new bridge abutments and a new rip-rap embankment.
|
Location: |
|
Resident Engineer: | Lokman Arran |
Construction Contract Value: | $4,035,081.35 |
Construction Bid Price: | $3,767,456.80 |
Initial Construction Estimate: | $2,140,765.00 |
District: | District 4 |
|