Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HATFIELD- NORTHAMPTON- WHATELY- RESURFACING AND RELATED WORK ON SECTIONS OF ROUTE 5/10
The work consists of roadway improvements for Route 5&10 in Northampton, Hatfield and Whately. The project begins at Interchange #21 in Northampton and proceeds northerly to Whately for a total distance of approximately 7.25 miles. The existing roadway varies in width from 24 feet to 40 feet. The proposed roadway will consist of two 11.5-foot travel lanes with paved shoulders varying in width from 2.5 feet to 8.5 feet, for a total roadway width of 28 to 40 feet. Work also includes improvements to drainage, guardrail, sight distance, and pavement markings.
Location:
  • Town of Hatfield
  • City of Northampton
  • Town of Whately
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: Other
    Project Manager: Albert Li
    Estimated Total Contract Cost: $3,029,249.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 2
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project