NORTHBOROUGH- TRAFFIC SIGNAL INSTALLATION, ROUTE 20 AT DAVIS STREET INCLUDING TIMES SQUARE
This project improves the geometry and traffic signals for Route 20 at West Main Street and Route 20 at Davis Street in Northborough. Geometric improvements involve minor widening of Route 20, realignment of West Main Street, development of new left turn lanes, and provision for sidewalks and pedestrian ramps. Drainage improvements include catch basins with deep sumps and other improvements to existing conditions. Traffic improvements include fully actuated traffic signal controls at each intersection with wire loop detection on all approaches, including high speed dilemma zone detection on Route 20. Mast arms and overhead signal faces are proposed for all approaches providing greater visibility. Tunnel visors, back plates and 12” lenses will aid in directing and enhancing the signal indications. New pavement markings and signing upgrades are provided.
Location:
  • Town of Northborough
  • Resident Engineer: Linda Terry
    Construction Contract Value: $1,861,569.00
    Construction Bid Price: $1,499,790.30
    Initial Construction Estimate: $1,587,909.55
    District: District 3

    Contracts (2) Progress
    # 30203 -- Design -- Traffic Signing/Signals
    Statewide - Traffic engineering services with traffic signal improvement projects. Final
    # 33227 -- Construction Contract
    Roadway Reconstruction at 2 Locations - Route 20 at West Main Street & Route 20 at Davis Street. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/22/2003
    Contract Information
    Project Designer: Consultant
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/30/2001
    Project Review Committee PRC Approved 06/26/2001
    Project Review Committee Letter 01/11/2002
    Project Status Advertised 09/21/2002
    Project Management