Project Description:
LANESBOROUGH- RECONSTRUCTION ON ROUTE US 7 & STATE ROUTE 8 CONNECTOR ROAD
The proposed project consists of improvements to the Route 7/Route 8 Connector Road (formerly Berkshire Mall Drive), from the vicinity of the intersection with Route 7 to the vicinity of the intersection with Route 8. The total project is approximately 2.0 miles long. The work includes excavation, full-depth roadway pavement construction, full-depth roadway reclamation, roadway widening, cold planning and resurfacing, geometric improvements, modification of traffic signals, granite curbing & edging and asphalt curb & berms installation, improvements to the drainage, landscaping, wetland alteration, guardrail installation, milling and resurfacing bridge pavement and replacing existing bridge joints, construction of a cement concrete retaining wall, signing, pavement marking and provision of safety controls and signing for construction operations.
Location:
  • Town of Lanesborough
  • Resident Engineer: Charles Najimy
    Construction Contract Value: $8,119,559.95
    Construction Bid Price: $6,341,210.30
    Initial Construction Estimate: $8,843,873.50
    District: District 1

    Contracts (1) Progress
    # 62158 -- Construction Contract
    Roadway Construction and Related Work for US Route 7 to Route 8 Connector Road. (ARRA Project) Completed

    Bridges

    Contract Dates
    Notice to Proceed: 02/25/2010
    Contract Information
    Project Designer: Other
    Funding Source: American Recovery & Reinvestment Act
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 01/13/1997
    Project Review Committee PRC Approved 02/25/1997
    Project Status Advertised 12/26/2009
    Project Management
    100% Design 100% Package Received 08/28/2008
    100% Design 100% Package Received 01/30/2009
    100% Design 100% Package Comments to DE 12/03/2008
    100% Design 100% Package Comments to DE 03/02/2009
    75% Design 75% Package Received 06/01/2007
    Final Design PS&E Received 12/16/2009
    Final Design PS&E to FAPRO 12/07/2009
    Consultant Contract Process NTP Issued 07/24/2006