Project Description:
WESTMINSTER- RECONSTRUCTION ON SOUTH STREET, FROM DAWLEY STREET/CARTER ROAD TO MAIN STREET (ROUTE 2A)
The proposed work consists of roadway improvements to the South Street corridor from the Dawley Street and Carter Road intersection to the Main Street (Route 2A) intersection, for a distance of 800 meters. The proposed work will include roadway resurfacing and widening, drainage system improvements, cement concrete sidewalk construction, granite curb installation, and safety improvements such as signing and pavement markings.
Location:
  • Town of Westminster
  • Design Responsibility: Municipality
    Project Manager: Michael-kosmas Bloukos
    Estimated Total Contract Cost: $2,503,721.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.