| Project Description: |
STERLING- RESURFACING AND RELATED WORK ON A SECTION OF ROUTE I-190
This project involves resurfacing and related work (bridge deck repairs, guardrail replacement, drainage system cleaning and repairs, tree and brush removal along shoulders) on I-190 from Route 140 in Sterling northerly 6.5 miles to the Lancaster Town Line. The Route 140 and Route 12 interchanges are included.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Albert Li![]() |
| Estimated Total Federal Participating Construction Cost: | $6,500,000.00 |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 11/02/2002 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||