| Project Description: |
HUDSON- BRIDGE REPLACEMENT, BR# H-25-007, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER
The existing bridge will be demolished and replaced with a new bridge. 300 feet of the westerly approach and 500 feet of the easterly approach will be reconstructed. Two way traffic will be maintained during construction.
|
| Location: |
|
| Resident Engineer: | Patrick Marion![]() |
| Construction Contract Value: | $4,260,590.00 |
| Construction Bid Price: | $3,628,628.00 |
| Initial Construction Estimate: | $3,162,452.50 |
| District: | District 3 |
| Current Status: | Phase 2 bridge demolition is under way. The bridge deck, bridge beams, and abutments have been removed. A cofferdam is under construction to allow removal of the centrer pier. Drilled shafts for the new bridge will begin after phase2 bridge demolition is completed. (as of 01/09/2009) |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||