HUDSON- BRIDGE REPLACEMENT, BR# H-25-007, ROUTE 62 (MAIN STREET) OVER THE ASSABET RIVER
The existing bridge will be demolished and replaced with a new bridge. 300 feet of the westerly approach and 500 feet of the easterly approach will be reconstructed. Two way traffic will be maintained during construction.
Location:
  • Town of Hudson
  • Resident Engineer: Patrick Marion
    Construction Contract Value: $4,260,590.00
    Construction Bid Price: $3,628,628.00
    Initial Construction Estimate: $3,162,452.50
    District: District 3
    Current Status: Phase 2 bridge demolition is under way. The bridge deck, bridge beams, and abutments have been removed. A cofferdam is under construction to allow removal of the centrer pier. Drilled shafts for the new bridge will begin after phase2 bridge demolition is completed. (as of 01/09/2009)

    Contracts (1) Progress
    # 44385 -- Construction Contract
    Hudson - Route 62 (Main St) over the Assabet River, Bridge Replacement, PF # 602131 Completed

    Bridges

    Contract Dates
    Notice to Proceed: 06/20/2006
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Phase 2 bridge demolition is under way. The bridge deck, bridge beams, and abutments have been removed. A cofferdam is under construction to allow removal of the centrer pier. Drilled shafts for the new bridge will begin after phase2 bridge demolition is completed.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 02/20/1997
    Project Review Committee PRC Approved 05/06/1997
    Project Status Advertised 09/24/2005
    Project Management
    100% Design 100% Package Received 01/14/2005
    100% Design 100% Package Comments to DE 03/07/2005
    25% Design 25% Package Received 01/02/1999
    25% Design 25% Package Comments to DE 12/28/1999
    75% Design 75% Package Received 03/06/2002
    75% Design 75% Package Comments to DE 02/11/2004
    Final Design PS&E Received 05/16/2005
    Final Design PS&E to FAPRO 05/16/2005