Project Description:
|
MEDWAY- HIGHWAY RECONSTRUCTION, ROUTE 126 (SUMMER STREET) FROM BELLINGHAM T.L. TO HOLLISTON T.L
The total length of this full depth reclamation, signal improvement project is approximately 2.65 miles, between Village Street and the Holliston Town Line. This project will result in the construction of two 12 foot travel lanes, with 4 foot paved useable shoulders. A 5 foot bituminous concrete handicap accessible sidewalk is proposed on the west side of Summer Street for the entire length of project. Sidewalk is proposed for several sections on the east side for an approximate total length of 7000 feet. New Signals are proposed for the intersection of Summer Street (Route 126) and Milford Street (Route 109).
|