IPSWICH- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 133 (ESSEX ROAD)
The purpose of this project is to improve the riding surface of Route 133 and provide pedestrian improvements from the intersection of Route 1A to the Essex Town Line, a distance of approximately 2 miles. Along with resurfacing work, a sidewalk with curb will be constructed on the north side of roadway and the closed roadway drainage system will be modified to accommodate the proposed sidewalk. The guardrail will also be repaired.
Location:
  • Town of Ipswich
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Li
    Estimated Total Contract Cost: $1,888,260.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information