Project Description:
GREAT BARRINGTON- RECONSTRUCTION OF MAIN STREET (ROUTE 7)
The project will rehabilitate Main Street beginning at Cottage Street and ending at St. James Place. Work will include milling, overlay and some full depth reconstruction. Sidewalks will be reconstructed, drainage will be improved and traffic signal will be coordinated. Period lighting and landscaping may also be included.
Location:
  • Town of Great Barrington
  • Resident Engineer: Michael Wall
    Construction Contract Value: $6,206,120.82
    Construction Bid Price: $5,098,241.86
    Initial Construction Estimate: $4,217,482.50
    District: District 1

    Contracts (2) Progress
    # 64315 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 79874 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Traffic Signals) along a Section of Main Street (Routes 7 and 23). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 06/24/2014
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 04/03/1997
    Project Review Committee PRC Approved 10/07/1997
    Project Status Advertised 09/21/2013
    Project Management
    100% Design 100% Package Received 12/03/2012
    100% Design 100% Package Received 05/31/2013
    100% Design 100% Package Comments to DE 01/30/2013
    100% Design 100% Package Comments to DE 07/01/2013
    25% Design 25% Package Received 01/18/2011
    25% Design 25% Package Received 03/30/2012
    25% Design 25% Package Comments to DE 08/12/2011
    25% Design Design Public Hearing 05/03/2012
    75% Design 75% Package Received 07/10/2012
    75% Design 75% Package Comments to DE 10/05/2012
    Final Design PS&E Received 09/03/2013
    Final Design PS&E to FAPRO 09/06/2013