Project Description: |
LANCASTER- BRIDGE REPLACEMENT, BR# L-02-007 ROUTE 117 (MAIN STREET) OVER THE NORTH NASHUA RIVER
The work consists of replacing the existing Main Street Bridge over the Nashua River, as well as reconstruction of Main Street at the approaches.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Michael Papadopoulos![]() |
Estimated Total Contract Cost: | $1,840,152.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|