Project Description: |
WEST STOCKBRIDGE- BRIDGE REPLACEMENT, BR# W-22-007, ROUTE 102 OVER THE WILLIAMS RIVER
The purpose of this project is to replace the existing bridge and perform minor incidental roadway work. The proposed bridge reconstruction will be a two stage project with a temporary traffic control signal to maintain traffic across the bridge. Included in this project are guardrail, curbing and sediment controls for the Williams River.
|
Location: |
|
Resident Engineer: | Michael Cullett |
Construction Contract Value: | $1,628,193.00 |
Construction Bid Price: | $1,444,357.60 |
Initial Construction Estimate: | $899,494.70 |
District: | District 1 |
Current Status: | Contractor is doing prep work for sidewalks. (as of 05/02/2008) |
|
Bridges
|
|
|
|
|