| Project Description: |
CHESHIRE- ROADWAY RECONSTRUCTION INCLUDING REMOVAL OF TUNNEL ON A SECTION OF ROUTE 8
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $201,307.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||