Project Description: |
CHESHIRE- ROADWAY RECONSTRUCTION INCLUDING REMOVAL OF TUNNEL ON A SECTION OF ROUTE 8
|
Location: |
|
Project Manager: | Albert Li![]() |
Estimated Total Contract Cost: | $201,307.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 1 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|