| Project Description: |
NORTH ATTLEBOROUGH- TRAFFIC SIGNAL RECONSTRUCTION ON ROUTE 1 (EAST WASHINGTON STREET) AT ELM STREET
The work to be done under this contract consists of reconstructing the traffic signal system at the intersection of Route 1 (East Washington Street) at Elm Street in North Attleboro. The work includes installation of all new traffic signal equipment, roadway improvements including adding left turn lanes, reconstructing sidewalks and medians, and installing new traffic signs and pavement markings.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Andreina Luckett![]() |
| Estimated Total Contract Cost: | $714,135.84 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|