| Project Description: |
ARLINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2A (SUMMER STREET)
The work consists reconstructing the roadway, constructing cement concrete sidewalks, installing granite curbing, and upgrading the existing drainage, traffic signals, traffic signs and markings.
|
| Location: |
|
| Resident Engineer: | Jay Patel![]() |
| Construction Contract Value: | $5,622,070.00 |
| Construction Bid Price: | $4,310,067.90 |
| Initial Construction Estimate: | $3,833,928.00 |
| District: | District 4 |
| Current Status: | The project is substansially complete. (as of 02/20/2009) |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||