| Project Description: |
ARLINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2A (SUMMER STREET)
The work consists reconstructing the roadway, constructing cement concrete sidewalks, installing granite curbing, and upgrading the existing drainage, traffic signals, traffic signs and markings.
|
| Location: |
|
| Project Manager: | Martin Leelman![]() |
| Estimated Total Contract Cost: | $5,622,070.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||