Project Description: |
ARLINGTON- ROADWAY RECONSTRUCTION ON A SECTION OF ROUTE 2A (SUMMER STREET)
The work consists reconstructing the roadway, constructing cement concrete sidewalks, installing granite curbing, and upgrading the existing drainage, traffic signals, traffic signs and markings.
|
Location: |
|
Resident Engineer: | Jay Patel |
Construction Contract Value: | $5,622,070.00 |
Construction Bid Price: | $4,310,067.90 |
Initial Construction Estimate: | $3,833,928.00 |
District: | District 4 |
Current Status: | The project is substansially complete. (as of 02/20/2009) |
|
Bridges |
|
|
|
|