Project Description:
AVON- ROADWAY RECONSTRUCTION ON WEST MAIN STREET TO BROCKTON, AVON TOWNLINE
Approximately 1,320 meters of West Main Street will be reconstructed from the Brockton townline towards downtown Avon. Sidewalks and paved shoulders will be included on both sides of the roadway. Bumpouts will be provided in limited locations to calm traffic and reduce speeds.
Location:
  • Town of Avon
  • Design Responsibility: Municipality
    Right of Way Responsibility: Other
    Project Manager: Filbert Yee
    Estimated Total Contract Cost: $3,374,318.57
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project