| Project Description: |
AVON- ROADWAY RECONSTRUCTION ON WEST MAIN STREET TO BROCKTON, AVON TOWNLINE
Approximately 1,320 meters of West Main Street will be reconstructed from the Brockton townline towards downtown Avon. Sidewalks and paved shoulders will be included on both sides of the roadway. Bumpouts will be provided in limited locations to calm traffic and reduce speeds.
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Project Manager: | Filbert Yee![]() |
| Estimated Total Contract Cost: | $3,374,318.57 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||