| Project Description: |
LEXINGTON- LINCOLN- REPLACEMENT OF CONCRETE MEDIAN BARRIER ON A SECTION OF ROUTE 2 (CAMBRIDGE TURNPIKE)
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | Other |
| Project Manager: | John Gendall![]() |
| Estimated Total Federal Participating Construction Cost: | $900,000.00 |
| District: | District 4 |
| Current Status: | This project has been advertised for construction bids. (as of 04/14/2001 ) |
|
Bridges |
||||||
|
|
|
||||||||||||||