| Project Description: |
CHESTER- HUNTINGTON- RESURFACING & RELATED WORK ON ROUTE 20 (FROM MM36 , CHESTER, TO MM42.6, HUNTINGTON)
The project will resurface 6.8 miles of State Highway Route 20 from Mile Marker 36 in the Town of Chester to the Huntington/Russell Town Line. The works also includes drainage improvements, installation of a new drainage trunk line in the center of Huntington, curbing, sidewalks, traffic sign replacement and new pavement markings.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $4,273,339.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||