Project Description: |
AMESBURY- BRIDGE REPLACEMENT, A-07-015, R STREET OVER THE BACK RIVER
The proposed project consists of replacing the existing single span steel stringer bridge over the Back River in its present location. The proposed new single span concrete bridge will be founded on new abutments which will be constructed behind the existing abutments. Minor improvements to the approach roadway will be provided.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Filbert Yee![]() |
Estimated Total Contract Cost: | $1,543,602.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project has been advertised for construction bids. (as of 02/13/2010 ) |
|