AMESBURY- BRIDGE REPLACEMENT, BR# A-07-004 THOMPSON STREET OVER THE POWWOW RIVER
The proposed project consists of replacement of the existing bridge on the same alignment with improvements to the approach roadway.
Location:
  • Town of Amesbury
  • Design Responsibility: Consultant
    Right of Way Responsibility: Municipality
    Project Manager: Gautam Sen
    Estimated Total Contract Cost: $924,731.00
    Estimated Total Federal Participating Construction Cost: N/A
    Total Estimated Project Cost: $600,000.00
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • A07004 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project