Project Description: |
AMESBURY- BRIDGE REPLACEMENT, BR# A-07-004 THOMPSON STREET OVER THE POWWOW RIVER
The proposed project consists of replacement of the existing bridge on the same alignment with improvements to the approach roadway.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Municipality |
Project Manager: | Gautam Sen![]() |
Estimated Total Contract Cost: | $924,731.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
Total Estimated Project Cost: | $600,000.00 |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|