| Project Description: |
AYER- DUNSTABLE- GROTON- PEPPERELL- CONSTRUCTION OF A MULTI-USE TRAIL (NASHUA RIVER RAIL TRAIL) ALONG ABANDONED B&M RR BED
|
| Location: |
|
| Design Responsibility: | Municipality |
| Right of Way Responsibility: | Other |
| Project Manager: | Kimberley Sloan![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project has been advertised for construction bids. (as of 09/23/2000 ) |
|
Bridges |
||||||
|
|
|
|||||||||||||||||