Project Description: |
AYER- DUNSTABLE- GROTON- PEPPERELL- CONSTRUCTION OF A MULTI-USE TRAIL (NASHUA RIVER RAIL TRAIL) ALONG ABANDONED B&M RR BED
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Other |
Project Manager: | Kimberley Sloan |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project has been advertised for construction bids. (as of 09/23/2000 ) |
|
Bridges |
|
|
|