| Project Description: |
CHARLEMONT- BRIDGE REPLACEMENT, BR# C-05-026 SOUTH RIVER ROAD OVER BOZRAH BROOK
The purpose of this project is to replace the South River Road Bridge over Bozrah Brook on the same alignment with improvements to the approach roadway.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Other |
| Project Manager: | Michael Papadopoulos![]() |
| Estimated Total Contract Cost: | $1,535,713.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 1 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||