Project Description:
WAREHAM- BRIDGE REPLACEMENT, BR# W-06-017, MAIN AVENUE OVER THE EAST RIVER
The proposed work will involve the construction of a new bridge spanning the East River and roadway reconstruction approximately 58 meters south of the existing bridge and 60 meters north of the existing bridge. The bridge will carry two lanes and two sidewalks. The bridge will be closed to vehicular traffic during construction of the new bridge, but pedestrian traffic will be maintained over a temporary bridge.
Location:
  • Town of Wareham
  • Project Manager: Albert Miller
    Estimated Total Contract Cost: $2,228,371.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W06017 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project