Project Description: |
WAREHAM- BRIDGE REPLACEMENT, BR# W-06-017, MAIN AVENUE OVER THE EAST RIVER
The proposed work will involve the construction of a new bridge spanning the East River and roadway reconstruction approximately 58 meters south of the existing bridge and 60 meters north of the existing bridge. The bridge will carry two lanes and two sidewalks. The bridge will be closed to vehicular traffic during construction of the new bridge, but pedestrian traffic will be maintained over a temporary bridge.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | Other |
Project Manager: | Albert Miller |
Estimated Total Federal Participating Construction Cost: | $850,000.00 |
District: | District 5 |
Current Status: | This project has been advertised for construction bids. (as of 02/28/2004 ) |
|