Project Description: |
DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS.
DISTRICT 1- REPAIR OF 19 CHEMICAL STORAGE SHEDS AT VARIOUS LOCATIONS
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | Other |
Project Manager: | Gerald Donnellan |
Estimated Total Federal Participating Construction Cost: | $250,000.00 |
District: | District 1 |
Current Status: | This project has been advertised for construction bids. (as of 03/02/2002 ) |
|
Bridges |
|
|
|