WESTBOROUGH- ROADWAY RECONSTRUCTION, ROUTE 30 (EAST MAIN STREET) INCLUDING THE INSTALLATION OF SIGNALS AT LYMAN STREET
The work consists of the reconstruction of the Route 30 and Lyman Street intersection, in Westborough. The work will include the installation of a traffic and pedestrian signal system, widening Route 30, cold planing and box widening, construction of sidewalk and wheelchair ramps, modifying existing drainage structures, additional storm water detention areas, signing and pavement markings.
Location:
  • Town of Westborough
  • Resident Engineer: Mohamed Zawahreh
    Construction Contract Value: $783,414.98
    Construction Bid Price: $629,606.80
    Initial Construction Estimate: $560,475.00
    District: District 3
    Current Status: Project is 60% completed. Anticipate roadway milling operations followed by asphalt paving. (as of 07/27/2006)
    Additional Info: Delayed utility work by others may delay the completion date of the project. (as of 07/27/2006)

    Contracts (1) Progress
    # 42914 -- Construction Contract
    Westborough - Roadway Reconstruction of Route 30 (East Main Street) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 11/14/2005
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Project is 60% completed. Anticipate roadway milling operations followed by asphalt paving.
    Additional Info
    Delayed utility work by others may delay the completion date of the project.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Initiation Form PRC Submitted 01/06/1998
    Project Review Committee PRC Approved 01/13/1998
    Project Status Advertised 05/28/2005
    Project Management
    100% Design 100% Package Received 02/10/2004
    100% Design 100% Package Comments to DE 11/29/2004
    25% Design Design Public Hearing 07/11/2001
    75% Design 75% Package Comments to DE 09/10/2004
    75% Design 75% Plans Complete 09/10/2004
    Final Design PS&E Received 04/21/2005
    Final Design PS&E to FAPRO 05/23/2005